Power Plant O&M

We have more than 8 years experience with O&M of many coal fired power plants and waste incinerator plant. The plant include:

– 2×140 T/H, 100 Bar, 505 C of Stoker Boiler + 2 Extraction Steam Turbine from MHI and MES Total Capacity 47 MWe

– 1 x 190 T/H, 100 Bar, 505 C of Foster Wheeler CFB Boiler + 1 Extraction Steam Turbine from Siemens 39 MWe

– 2x 110 T/H, 100 Bar, 510 C of Foster Wheeler CFB Boiler + 1 Extraction Steam Turbine from Siemens 25 MWe and 1 Back Pressure Steam Turbine from Siemens 14.5 MWe

-1×130 T/H, 100 Bar, 510 C of Hangzhou CFB Boiler + 1 Extraction Steam Turbine from Siemens 28 MWe

– 15 T/H 10 Bar, 200 C of waste incinerator plant using BFB Technology